935 Pacific – Brooklyn, NY

Back to Projects

Our role in this project included schematic design for the steel framing, composite deck, and CMU core wall detailing.  Challenges included creating a framing plan that accommodated the interlocking apartment units and minimization of floor sandwich depth.

Architect: Loadingdock5
Structural Engineer: Murray Engineering
Budget: $5 million
Construction Duration: 12 months

Gallery